Platinum mine strikes gold with our efficient control panel solution

Control Panel
We supplied a control panel solution for a platinum mine. It powers an industrial mineral dryer by UV+IR Engineering that dries wet samples from the mine. It consists of Weidmüller Group terminals, LAPP Group panel wire, and Siemesns circuit breakers, CPU modules, interfaces and PLCs.

System integrator: Integral Systems


share
Next Case Study

5-star renewable energy solution for Windtown Lagoon Hotel in Langebaan

H

Net Orders Checkout

Item Price Qty Total
Subtotal R 0.00
Shipping
Total

Shipping Address

Shipping Methods